BRIDGE OVER THE TOROPI RIVER

RUTA: BR-287  – SÃO PEDRO DO SUL (RS)

CHALLENGE Worn Franki piles, exposed reinforcement steel, concrete separation and many fissure points. The concrete pavement was compromised, there are missing expansion joints between spans, and deterioration of the bridge structural bearings.
SOLUTION New piles were driven without interfering with the existing piles. With the bridge stabilized the deteriorated assembly was replaced, lifting the girders with high capacity hydraulic jacks. The pavement was redone and the joints replaced by continuity slabs. The entire operation was undertaken without interrupting traffic.